904-264-1919 info@bhide-hall.com

Douglas Anderson School of the Arts

New construction of a 55,000 sf freestanding addition to an existing performing arts high school. Spaces include classrooms, new kitchen, cafeteria, and serving line with 5.300 SF indoor dining and 3,000 SF outdoor covered dining. Building is an EHPA (hurricane shelter).

New building and portions of the existing school are served by a new air cooler chilled water system. The building is constructed of concrete block clad with brick veneer and exterior metal wall panels. Existing kitchen was remodeled into a 3,400 SF dance studio with support spaces. Adjacent to the building is a covered outdoor art gallery.